新聞中心
AddTime:2017-12-25 Author:Xinyuren Hits:3018
1、 Tender description
1.1 Regardless of the result of the bidding, the bidder shall bear all the expenses for the preparation and submission of the bidding documents, and the tenderee shall not be responsible for any of these expenses.
1.2 This bidding document is an important basis for the bidder to prepare the bid and sign the contract. The bidder is expected to pay attention to it.
1.3 The bidder shall carefully survey the construction site, be familiar with the site topography, roads and surrounding environment, and understand all information and market risks that may affect the bid price. However, the bidder shall be fully responsible for the correctness of the data and information obtained, and the cost shall be borne by the bidder. Once winning the bid, the bidder shall not ask for additional compensation or extension of construction period under the pretext of not fully understanding the construction site. If the requirements are submitted, the tenderee will not make any consideration.
1.4 The competition measures to be adopted by the bidder shall be listed in detail in the bidding document, and shall be excluded or exempted in the relevant quotation in the bidding document.
1.5 In the bidding activities of the project, the bidder must be represented by the legal representative or the client of the legal representative of the enterprise. It is not allowed to assign personnel of other construction units to participate in the bidding. If any is found, it shall be treated as abandoned bidding.
1.6 It is strictly prohibited to subcontract the project.
1.7 The bidder shall participate in the bidding activities of the project on time according to the schedule specified in the bidding documents. In case of any discrepancy or incompleteness in the documents, the bidder shall be disqualified. If the bid is rejected, the bid is withdrawn halfway after bidding or the bid is accepted and the contract is not signed with Party A within the specified time limit due to delay for various reasons, the tenderee may re select the contractor.
2、 Project Overview:
2.1 Project Name: pile foundation project of Huizhou Xinyu human Technology Park Phase 1 of Huizhou Xinyu human Technology Co., Ltd.
2.2 Project location: Dongjiang science and Technology Park, Zhongkai high tech Zone, Huizhou City, Guangdong Province.
2.3 Project Overview: the project is located in Dongjiang high tech Industrial Park, Zhongkai high tech Zone, Huizhou City, Guangdong Province. The total land area of the project is 54991.20 square meters. It is planned to build three industrial plants, three dormitories and one complex building. The plant is a multi-storey plant, the dormitory building is a multi-storey building, and the complex building is a multi-storey single building, with a total building area of 106129 square meters. One three storey plant and one complex building are under construction in phase I Dormitory building (including the building area of the three-story factory building is 35113.47 square meters, and the building area of the dormitory building is 3091.48 square meters), with a total building area of 38204.95 square meters (the building area is only for reference and the specific building area is subject to the actual construction drawing). The foundation adopts hammering prestressed prefabricated pipe pile with a diameter of 500. The prestressed pile adopts PHC 500 ab 125-15 type in the national standard 10g409.
2.4 Scope of work and requirements:
The scope of this quotation: the construction shall be carried out according to the design drawings of pile foundation, main standards and specifications, and the requirements of geological survey report designed by Hunan Construction Group Co., Ltd. (the average pile length is tentatively determined to be 15m, and the actual construction shall prevail). Including but not limited to the following: mechanical mobilization and demobilization of pipe pile, driving (pressing) pile, test pile, pile extension, pile cutting, fabrication and installation of national standard steel pile tip, filling concrete at the bottom of pile core (filling concrete at the pile head, sealing steel plate of pile core and inserting steel bar at pile head shall be completed by the general contractor), drilling exploration within 3M depth of pile position and removal of underground obstacles at pile position, unqualified pile and broken pile not caused by Party A Treatment: the pile head is used as the reserved reinforcement of lightning protection downlead, the treatment of pile cap meeting the static load requirements, and cooperating with Party A to complete the engineering pile detection, etc.
2.5. Contracting method: it is required to contract labor and materials according to the requirements of the drawings, and the cost of safe and civilized construction and all unforeseen costs in the process of construction. The comprehensive unit price shall be lump sum, and the settlement shall be made according to the bottom elevation of bearing platform plus 10 cm after completion. The comprehensive unit price includes labor, materials, machinery, management fees, profits, taxes, fees and all measures and unforeseen costs in the construction process.
Calculation requirements of quantities: the actual measurement length of single pile is the length from the pile bottom to the bottom elevation of bearing platform plus 10 cm for settlement.
The pipe piles of Huizhou Sanhe pipe pile, Huizhou Sanhuan pipe pile and Jianhua pipe pile factory shall be used. If the pipe piles produced by other pipe pile factories are used, they shall be reported to Party A and can be used only after the approval procedures are completed.
3、 Construction period requirements:
3.1 The construction period is 30 days, and the specific commencement date shall be subject to the notice of Party A.
3.2 Except for the force majeure and the delay caused by the employer, the construction period of the project shall not be postponed; for the delay caused by the force majeure and Party A, the construction period can be postponed, but the tenderee shall not be liable for breach of contract. If the construction period is delayed due to the tenderer's reasons, a fine of 5 ‰ of the total project cost shall be deducted from the project payment every day.
4、 Payment method of project payment:
4.1 No advance payment will be made for the project;
4.2 The project progress payment shall be settled at 80% of the completed amount of Party B (the settlement amount shall not be less than 3000m each time, excluding the last time);
4.3 The settlement can only be carried out after the project is completed and accepted by Party A and relevant quality inspection departments. Party B shall submit the project settlement data and pile foundation divisional project acceptance data to Party A within 30 days, and Party A shall complete the review and reply to Party B within 30 days after receiving the settlement data and signing for receipt. If Party B agrees to the settlement price of Party A, it shall confirm in writing to Party A, and Party A shall pay 90% of the settlement price to Party B within 15 days.
4.4 10% of the remaining settlement shall be paid without interest after the completion and acceptance of the main works.
Note: Party B shall issue the corresponding legal and valid invoice to Party A at the same time of collection, and the invoice provided by Party B must
It is consistent with the content registered by the tax authorities. In case of any non-compliance with the national tax laws and regulations, Party A shall not settle the price, and Party B shall bear all the legal and economic responsibilities arising therefrom. In case of any economic loss to Party A, Party B shall make compensation.
5、 Tender offer and completion settlement:
The currency of the bid is RMB, and the bid price shall be lump sum based on the comprehensive unit price per meter.
6、 Bidding qualification requirements:
The bidder must be an independent legal person with qualification related to basic engineering.
7、 Bidding schedule
7.1 Issuance of bidding documents
On December 25, 2017, the bidder received the bidding documents.
7.2 Contact person and Tel: Wang Sheng 13902947890
7.3 Field survey: December 26, 2017 to December 27, 2017 (the bidder will go there by himself)
Bidding contact: Wang Sheng 13902947890
7.4 Time of bid return: the bidder shall send the bidding documents to Shenzhen Xinyu human Technology Co., Ltd. before 12:00 a.m. on December 29, 2017.
8、 Requirements for preparation of bidding documents:
8.1 All bidding documents shall be printed in Chinese and shall not be altered. The unit of measurement shall be the people's Republic of China
National legal unit of measurement.
8.2 The bidding documents must be sealed in sealed bags with the official seal of the bidder and the seal of the legal representative. Sealed bag outside
The bidder's name, address, contact person, telephone number and name of the bidding project shall be indicated in detail.
9、 Preparation and submission of tender documents
9.1 The tender document includes: tender offer;
9.2 The economic standard mainly includes:
9.2.1) Quotation list of bill of quantities, detailed list of comprehensive unit price group, unit price list of main materials;
9.2.2) Letter of bid;
9.2.3) Certificate, work safety license, business license, enterprise
Copies of certificates such as certificate of industrial qualification level;
9.2.4) Other commitments and instructions of the bidder.
9.3 The bidder shall prepare its bid in accordance with the bid form and bid price list provided in this bidding document,
Otherwise, it will be treated as abandoned bid.
9.4 The tender documents received by the tenderee after the specified deadline for tender submission will be rejected and returned to the tenderer unopened.
10、 Principles and methods of bid evaluation:
Bid evaluation principle: fair, fair and reasonable low price.
11、 Invalid tender
Any of the following circumstances shall be deemed as invalid tender:
11.1 Unsealed;
11.2 It is not filled in as required, the content is incomplete and the handwriting is unclear;
11.3 Without the seal of the unit and legal representative;
11.4 Late delivery of tender.
11.5 Malicious low-cost bidding or sub divisional and sub divisional works are obviously on the high side and on the low side.
12、 Bid validity:
12.1 the period of bid validity refers to 90 days from the deadline for bid submission to the date of contract award. During this period, all investment
All bids remain valid.
12.2 The period of validity of the bid documents of the successful bidder will be extended until the completion of the contract performance.
12.3 In addition to this bidding document, the tenderee shall issue addenda, omissions and other formal and valid letters during the bidding period,
They are all effective components of the bidding documents.
12.4 The bidder can find out the problems in the bidding documents in written form one day before the deadline for submission of bids
Notify the tenderee to modify.
13、 Others
13.1 In order to facilitate the review, evaluation and comparison of bidding documents, the bidding unit may ask the bidder for clarification
The requirements and responses for clarification of the bidding documents shall be made in written form.
13.2 Any error caused by misunderstanding of the terms of the bidding documents shall not be adjusted after bid opening.
13.3 The tenderee does not have to accept the lowest bid or any bid received, nor will it
Explain the reasons for the selection or rejection of any bid.
13.4 If the bidder has any explanation, please attach another paper and affix the official seal.
Huizhou xinyuren Technology Co., Ltd
December 23, 2017
> Company:0755-84611586
> Fax:0755-84611589
> Special line:4008855199
> Email:xyr@xinyuren.com
> Add.:Shenzhen longgang district liuzhou street back to hon Long Bu community peak (longgang) industrial plant no. 2 workshop